Arrow Road Construction Co.
Updated · BuildGets Team
Arrow Road Construction Co. appears in 5 public bid tabulations in the BuildGets BID index, mostly in Illinois, and was the low bidder on 2 (40 % of the bids with a known rank). Across 54 comparable unit prices, its typical bid is 38.3 % below the median of public bids for the same items. Latest bid opening: August 2023.
| Public bid tabs | 5 |
| Low bids (wins) | 2 · 40 % of ranked bids |
| States | Illinois (5) |
| Prices vs market | -38.3 % on 54 unit prices |
Track Arrow Road Construction Co.
Get an email when this contractor shows up in new public bid results: where, for which owner and how it ranked. Free with a BuildGets BID account while in beta.
Bid history
| Bid opening | Owner | State | Rank |
|---|---|---|---|
| Aug 24, 2023 | 2023 Eastside and CDBG Resurface Project | IL | 2 of 5 |
| May 3, 2023 | Village of Carpentersville Resurfacing Various Streets |
IL | Low bid |
| Apr 19, 2023 | 2022 CDBG Eastside Resurface Project | IL | 5 of 5 |
| May 18, 2022 | 2022 Lake Marian Road Resurface | IL | 2 of 7 |
| May 18, 2022 | 2022 Eastside Resurface Project | IL | Low bid |
BID Pro · coming soon
Competitor alerts for every contractor you follow, their unit prices item by item, unlimited =BIDPRICE and bid forms priced with the market. Planned price: $49/month. It is not available yet: join the list and your first month will be free.
Built from public bid tabulations published by public owners. Names are merged when they differ only in punctuation or legal suffix. Is this your company and something is wrong? Write to buildgets@buildgets.com and we will fix it.